Friendship Group (3, second highest in retail)Construction industry: the bill was missed at the end of the session. Basically, this bid is going to be opened higher and lower. Will this divergent expectation lead to a big retreat of the high-level collective? Let's leave this expectation first. Of course, everything is not absolute. If it is not low, it will be more than expected. Anyway, make more plans,Liangpin Puzi (3, food is the second highest)
Wuzhou Spring Festival (7 boards in 10 days, robot)Watch today;What about construction industry? Board 8, the location is ok, but it depends on the choice of funds, so their focus is on the day after the disagreement ends.
For example, the construction industry, late leakage, then continue to disagree tomorrow, how different it is, you have to look at the strength of his disagreement and the performance of the next day.At present, the focus is on the identification of low position and the choice of the main dragon. We have talked about the main dragon, and let's sort it out again. Looking sideways or upward at the core of the class and the change of hands in the theme fermentation, we should pay attention to the core of the class.Arrange the disk relative to the body core:
Strategy guide
12-14
Strategy guide